Home AEC City of Tacoma Files Pre-Application for $13.5MM Replacement Fire Station 7 on 2.27-Acre SERA Campus
AECCommercialIndustry News

City of Tacoma Files Pre-Application for $13.5MM Replacement Fire Station 7 on 2.27-Acre SERA Campus

Share
bady-abbas-yopr2c6ve7A-unsplash
Photo by bady abbas on Unsplash
Share

The new 13,500-square-foot station at 5801 South Tyler Street will sit on land Tacoma purchased from Parks Tacoma for $870,000 last August, replace a 1959-built 2,282-square-foot co-located facility, and break ground in July 2027 under a team that includes The Miller Hull Partnership. The City of Tacoma has filed pre-application documents for a new $13.5 […]

Thank you for your interest in The Registry. If you'd like to read further, you must Subscribe or Log In below to read the rest of this content.

Share

2026 Pacific Northwest CRE Rising Stars

PNW CRE Rising Stars

Featured Posts


Recent Posts

Related Articles

Skanska’s Mass-Timber Bevel Advances Through Design Review as 2.7MM SQFT of Bellevue Office Lines Up for Permits

Skanska's 12-story mass-timber Bevel office tower in downtown Bellevue moved through design...

Holman Distribution Center Commits to 428,000 SQFT at Sumner Central as Sumner Leads Puget Sound Industrial Absorption

Logistics operator Holman Distribution Center took on 245,000 more square feet and...

Downtown Seattle Office Absorbs 300,000 SQFT, Its First Positive Quarter Since 2021

Downtown Seattle's office market absorbed 300,000 square feet in the third quarter...