Home AEC Bellevue’s $200MM GCX Pedestrian Bridge Over I-405 Secures Federal Funding, Eyes 2030 Opening
AECIndustry News

Bellevue’s $200MM GCX Pedestrian Bridge Over I-405 Secures Federal Funding, Eyes 2030 Opening

Share
Share

The 2,000-foot span will function as a linear park connecting downtown to the Wilburton neighborhood and the regional Eastrail system. A $2 million federal grant is the latest funding milestone for Bellevue's Grand Connection Crossing, or GCX, a proposed 2,000-foot pedestrian and bicycle bridge designed to vault over Interstate 405 and stitch together two sides […]

Thank you for your interest in The Registry. If you'd like to read further, you must Subscribe or Log In below to read the rest of this content.

Share

2026 Pacific Northwest CRE Rising Stars

PNW CRE Rising Stars

Featured Posts


Recent Posts

Related Articles

Macerich Narrows Q3 Loss to $16.7MM as 1,125,000 SQFT Washington Square Anchors Its Oregon Footprint

Macerich narrowed its third-quarter loss to $16.7 million as income at its...

Principal Asset Management Provides $37.9MM Bridge Loan for New Covington Industrial Project

Principal Asset Management has closed a $37.9 million bridge loan on a...

Macerich’s 2026 Playbook Shows the Mall Market Splitting Into Trophies and Holdouts

Macerich's third-quarter results read like a field guide to the 2026 mall...

22-Suite Eritage Resort and 350-Acre Vineyard Estate in Walla Walla Hits the Market

A small luxury resort in Walla Walla wine country is for sale...